THE CLIENT

A plasma technology company based in the South West of England who are leading providers of high-technology products and services to the world’s leading industrial companies and scientific research communities, with a focus on greener economy, increased connectivity, improved health and leaps in scientific understanding.

THE BRIEF

Storvik FM Limited came to us on behalf of their client with the need for a short-term facility while a new all-purpose facility was being built, as the client had a new production line that couldn’t wait to be initiated. Budgetary constraints and a tight timeframe were critical factors in this build – for an Original Equipment Manufacturer (OEM) for the semiconductor industry.

Following a late Friday afternoon phone call to Guardtech, the response was immediate and a survey was undertaken the following Monday, with the initial design complete within a week

Peter Stratton, Director at Storvik FM Limited

THE SOLUTION

A Controlled Environment designed, installed, cleaned and commissioned by Guardtech built to the following specification:

Structural: GT Shell Plus, GT Lid Plus, GT Lid Max, GT Deck Plus, GT Access Plus.

Electrical: GT Lux Lite, 13-amp small power, flush-mounted with embedded containment within the panel core, three-phase power sockets wall mounted, electromagnetic door interlock system, automatic swing-arm door closing systems on large double doors with infrared activation, digital touchscreen HMI group fan speed controller.

Mechanical: GT Flow Plus Fan Filter Units including H14 HEPA, upflow unit providing total air supply of 3m2 per second.

Monitoring: GT Scan Plus digihelix gauges.

THE CHALLENGES

Space: The space was not really appropriate for an off-the-shelf cleanroom – there were many limiting factors that interfered with a smooth process, including a floor with significant gradient, service clashes that could not be removed and a ceiling that would not bear the weight imposed by the cleanroom requirements.

Floor: A system was devised for the floor track which allowed us at interval to raise the panel from beneath to ensure a level and uniform ceiling could be installed.

Timeframe: Due to the extremely tight timeframe and budget limitations, a bespoke solution needed to be found that accommodated these challenges – there was no time to rectify the building, which would’ve been the approach Guardtech opted for in a situation like this.

Bespoke solutions: Other cleanroom providers were sounded out for this project, but the client quickly realised that they were only prepared to offer off-the-shelf solutions that were not fit for the requirements of this job. Guardtech were as flexible and adaptable as ever, delivering exactly what the client needed within the tight timeframe that other providers simply couldn’t match.

Plenum: The framework and the utilities meant that a standard plenum design could not be implemented so a stepped system was devised, taking support from the structural framework that was added. Additionally, rather than inserting return air columns, all the structural walls were double-skinned to allow for return air chases for the exhaust air to return to the AHU (air handling unit), while the double-skinning provided additional structural support for the panelled ceiling above.

Structural: A bespoke steel framework was created that facilitated all the clashing services and allowed for a supporting structure to be built around these utilities, eliminating the need for removal or revision.

THE RESULT

Peter Stratton, Director at Storvik FM Limited, said: “Our client, a South West-based plasma technology business, had an urgent requirement for an ISO5 extension to an existing ISO7 cleanroom, in order to expand their processing capability. Customer demand dictated that time was of the essence, and there was only a 12-week window during which the ISO5 cleanroom could be designed and built.

 “Following a late Friday afternoon phone call to Guardtech, the response was immediate and a survey was undertaken the following Monday, with the initial design complete within a week. The materials and equipment used to complete the build in such a tight timeframe were selected by Guardtech based on availability, suitability and cost, allowing the cleanroom to be built and commissioned within the required period, and within budget despite a couple of small setbacks. Overall, the Senior Applications Engineer responsible for the site was happy with the performance and outcome.”

Case Studies Explore Other Projects

ISO8 Precision Systems Modular
Aerospace

ISO8 Precision Systems Modular

Read Case Study
ISO7 Electronics Softwall Isopods
Micro Electronics

ISO7 Electronics Softwall Isopods

Read Case Study
ISO8 Medical Device
Medical Device

ISO8 Medical Device

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
Grade C&D CleanCube GMP
R&D

Grade C&D CleanCube GMP

Read Case Study
ISO6 Packaging Hybrid Isopod
Injection Moulding

ISO6 Packaging Hybrid Isopod

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
ISO8 Medical Device
Medical Device

ISO8 Medical Device

Read Case Study
Grade D Medicine Manufacturing Modular
Pharmaceutical

Grade D Medicine Manufacturing

Read Case Study
ISO5 Graphene Research Facility
R&D

ISO5 Graphene Research Facility

Read Case Study
ISO8 Precision Systems Modular
Aerospace

ISO8 Precision Systems Modular

Read Case Study
ISO7 Packaging Modular
Aerospace

ISO7 Packaging Modular

Read Case Study
ISO7 Manufacturing
Aerospace

ISO7 Manufacturing Modular

Read Case Study
ISO8 Aerospace
Aerospace

ISO8 Aerospace Composites

Read Case Study
Class 10,000/ISO7
Aerospace

ISO7 Aerospace Consultancy

Read Case Study
Class 10,000/ISO6
Aerospace

ISO6 Aerospace Parts

Read Case Study
Class 10,000/ISO7
Automotive

ISO7 Automotive Parts

Read Case Study
Class 100,000/ISO8
Automotive

ISO8 Automotive Parts

Read Case Study
ISO8 CleanCube Lorry Conversion
Diagnostics

CleanCube Lorry Conversion

Read Case Study
CleanCube Mobi Vans
Diagnostics

CleanCube Mobi Vans

Read Case Study
Diagnostics Reagent Manufacturing
Diagnostics

Diagnostics Reagent Manufacturing

Read Case Study
CleanCube mobile solutions
Diagnostics

CleanCube mobile solutions

Read Case Study
Class 1,000/ISO6
Digital Printing

ISO6 Printed Electronics

Read Case Study
Class 100,000/ISO8
Digital Printing

ISO8 Inkjet Printing

Read Case Study
ISO7 Injection Moulding Softwall Isopod
Injection Moulding

ISO7 Injection Moulding Softwall Isopod

Read Case Study
ISO6 Packaging Hybrid Isopod
Injection Moulding

ISO6 Packaging Hybrid Isopod

Read Case Study
Class 1,000/ISO6
Injection Moulding

ISO6 Plastic Packaging

Read Case Study
ISO8 Medical Device
Medical Device

ISO8 Medical Device

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
ISO8 Medical Device
Medical Device

ISO8 Medical Device

Read Case Study
Sterile Container Manufacturing Facility
Medical Device

ISO7 Sterile Container Facility

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
Medical Device Softwall ISOPOD
Medical Device

Medical Device Softwall ISOPOD

Read Case Study
Class 100,000/ISO8
Medical Device

ISO8 Medical Device

Read Case Study
Class ISO7/Grade C
Medical Device

ISO7 Medical Device Assembly

Read Case Study
ISO7 Electronics Softwall Isopods
Micro Electronics

ISO7 Electronics Softwall Isopods

Read Case Study
ISO7 LCD Technology Research Facility
Micro Electronics

ISO7 LCD Technology Research Facility

Read Case Study
Semiconductor facility
Micro Electronics

ISO7 Microelectronics Suite

Read Case Study
Semiconductor facility
Micro Electronics

ISO5 Semiconductor Facility

Read Case Study
ISO 6 Semiconductor Facility
Micro Electronics

ISO6 Semiconductor Facility

Read Case Study
Class 10/ISO4
Micro Electronics

ISO4 Semi-Conductor Cleanroom

Read Case Study
ISO7 Microscopy Cleanroom
Optical

ISO7 Microscopy Cleanroom

Read Case Study
ISO7 Optical Manufacturing Facility
Optical

ISO7 Optical Manufacturing Facility

Read Case Study
Class 10,000 / ISO7
Optical R&D

ISO7 Optoelectronics

Read Case Study
Grade D Medicine Manufacturing Modular
Pharmaceutical

Grade D Medicine Manufacturing

Read Case Study
Pharmaceutical Development Suite
Pharmaceutical

Class C Pharmaceutical Suite

Read Case Study
Cleanroom Consumables Manufacturing Site
Pharmaceutical

ISO7 Cleanroom Consumables Facility

Read Case Study
CleanCube Grade D Modular Building
Pharmaceutical

CleanCube Grade D Modular Building

Read Case Study
CNC: Pharma QC Lab
Pharmaceutical

CNC QC Laboratory

Read Case Study
Grade D Packaging
Pharmaceutical

Grade D packaging

Read Case Study
Grade C / ISO7
Pharmaceutical

Grade C Cleanroom Relocation

Read Case Study
Grade C / ISO7
Pharmaceutical

Grade C Pharmaceutical Cleanroom

Read Case Study
Grade C&D CleanCube GMP
R&D

Grade C&D CleanCube GMP

Read Case Study
ISO4, 6 & 7 Nanofabrication Facility
R&D

ISO4, 6 & 7 Nanofabrication Facility

Read Case Study
ISO5 Graphene Research Facility
R&D

ISO5 Graphene Research Facility

Read Case Study
ISO5 Graphene Research Centre
R&D

ISO5 Graphene Research Centre

Read Case Study
Microwave Processing Research Centre
R&D

ISO7 Microwave Processing Research

Read Case Study
Class 1,000/ISO6
R&D

ISO6 Cleanroom Relocation

Read Case Study
Class 10,000 / ISO7
Optical R&D

ISO7 Optoelectronics

Read Case Study