ISO7 Packaging Modular

Packaging

22°C+/-3°C / 50%+/-10%

70m2

THE CLIENT

Reliance Precision – providers of custom-built, high reliability, precision instrumentation to customers from a diverse range of global markets. Their engineering capabilities include design, development, prototyping, manufacturing, assembly and test, complemented by a catalogue of precision motion control components and electro-mechanical assemblies.

THE BRIEF

Guardtech Cleanrooms were commissioned to design and build a 70sqm ISO7 controlled environment to support the processing element of Reliance Precision’s operation – packaging and sealing their precision-engineered parts for delivery to clients.

The team applied the same high standards to this build as they would with any Guardtech Group project

Elliott Pearce, Project Manager

THE TECH SPECS

A Controlled Environment designed, installed, cleaned and commissioned by Guardtech built to the following specification:

Structural: GT Shell Plus PIR wall panels, GT Deck Plus ESD Vinyl capped & coved, GT Access Plus GRP cleanroom doors, GT Access Fire.

Electrical: 20 x 13-amp double sockets in PVC trunking. Electromagnetic interlock doors. GT Lux Pro lighting providing 900 lux average at bench level.

Mechanical: GT Flow Plus H14 HEPA and G4 Fan Filter Units.

THE CHALLENGES

As a smaller-scale modular cleanroom project, this build presented the team with very few challenges and issues to tackle. There were, however, some issues presented by a challenging lighting requirement and access to the building area.

Lighting: Because of the nature of their precision manufacturing work, the client required 900 lux lighting at bench level. Sourcing lights bright enough to achieve such a high lux whilst also delivering the desired colour warmth (as close to daylight as possible) was tricky, but the Guardtech team managed to find a solution.

Access: The build took place on the second floor of the facility, which presented the Install team with a series of challenges. There was a very small goods lift, but all larger materials – including doors and wall panels – had to be carried upstairs by hand. The Guardtech Cleanrooms team rolled their sleeves up, literally and metaphorically, and took great care to ensure the high standards of the facility were maintained throughout the construction.

THE RESULT

Guardtech Group Modular Cleanrooms Project Manager Engineer Elliott Pearce said: “This was a fairly straightforward modular build, but the team applied the same high standards to it as they would with any Guardtech Group project.

 “It was a real pleasure working with such a helpful client and it’s a real badge of honour for us to support the really impressive work they do.”

Case Studies Explore Other Projects

Grade C&D CleanCube GMP
R&D

Grade C&D CleanCube GMP

Read Case Study
ISO6 Packaging Hybrid Isopod
Injection Moulding

ISO6 Packaging Hybrid Isopod

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
ISO8 Medical Device
Medical Device

ISO8 Medical Device

Read Case Study
Grade D Medicine Manufacturing Modular
Pharmaceutical

Grade D Medicine Manufacturing

Read Case Study
ISO5 Graphene Research Facility
R&D

ISO5 Graphene Research Facility

Read Case Study
ISO8 CleanCube Lorry Conversion
Diagnostics

CleanCube Lorry Conversion

Read Case Study
Medical Device Softwall ISOPOD
Medical Device

Medical Device Softwall ISOPOD

Read Case Study
Diagnostics Reagent Manufacturing
Diagnostics

Diagnostics Reagent Manufacturing

Read Case Study
ISO7 Optical Manufacturing Facility
Optical

ISO7 Optical Manufacturing Facility

Read Case Study
ISO7 Packaging Modular
Aerospace

ISO7 Packaging Modular

Read Case Study
ISO7 Manufacturing
Aerospace

ISO7 Manufacturing Modular

Read Case Study
ISO8 Aerospace
Aerospace

ISO8 Aerospace Composites

Read Case Study
Class 10,000/ISO7
Aerospace

ISO7 Aerospace Consultancy

Read Case Study
Class 10,000/ISO6
Aerospace

ISO6 Aerospace Parts

Read Case Study
Class 10,000/ISO7
Automotive

ISO7 Automotive Parts

Read Case Study
Class 100,000/ISO8
Automotive

ISO8 Automotive Parts

Read Case Study
ISO8 CleanCube Lorry Conversion
Diagnostics

CleanCube Lorry Conversion

Read Case Study
CleanCube Mobi Vans
Diagnostics

CleanCube Mobi Vans

Read Case Study
Diagnostics Reagent Manufacturing
Diagnostics

Diagnostics Reagent Manufacturing

Read Case Study
CleanCube mobile solutions
Diagnostics

CleanCube mobile solutions

Read Case Study
Class 1,000/ISO6
Digital Printing

ISO6 Printed Electronics

Read Case Study
Class 100,000/ISO8
Digital Printing

ISO8 Inkjet Printing

Read Case Study
ISO6 Packaging Hybrid Isopod
Injection Moulding

ISO6 Packaging Hybrid Isopod

Read Case Study
Class 1,000/ISO6
Injection Moulding

ISO6 Plastic Packaging

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
ISO8 Medical Device
Medical Device

ISO8 Medical Device

Read Case Study
Sterile Container Manufacturing Facility
Medical Device

ISO7 Sterile Container Facility

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
Medical Device Softwall ISOPOD
Medical Device

Medical Device Softwall ISOPOD

Read Case Study
Class 100,000/ISO8
Medical Device

ISO8 Medical Device

Read Case Study
Class ISO7/Grade C
Medical Device

ISO7 Medical Device Assembly

Read Case Study
Class 100,000/ISO8
Medical Device

ISO8 Advanced Wound Dressing

Read Case Study
ISO7 LCD Technology Research Facility
Micro Electronics

ISO7 LCD Technology Research Facility

Read Case Study
Semiconductor facility
Micro Electronics

ISO7 Microelectronics Suite

Read Case Study
Semiconductor facility
Micro Electronics

ISO5 Semiconductor Facility

Read Case Study
ISO 6 Semiconductor Facility
Micro Electronics

ISO6 Semiconductor Facility

Read Case Study
Class 10/ISO4
Micro Electronics

ISO4 Semi-Conductor Cleanroom

Read Case Study
ISO7 Microscopy Cleanroom
Optical

ISO7 Microscopy Cleanroom

Read Case Study
ISO7 Optical Manufacturing Facility
Optical

ISO7 Optical Manufacturing Facility

Read Case Study
Class 10,000 / ISO7
Optical R&D

ISO7 Optoelectronics

Read Case Study
Grade D Medicine Manufacturing Modular
Pharmaceutical

Grade D Medicine Manufacturing

Read Case Study
Pharmaceutical Development Suite
Pharmaceutical

Class C Pharmaceutical Suite

Read Case Study
Cleanroom Consumables Manufacturing Site
Pharmaceutical

ISO7 Cleanroom Consumables Facility

Read Case Study
CleanCube Grade D Modular Building
Pharmaceutical

CleanCube Grade D Modular Building

Read Case Study
CNC: Pharma QC Lab
Pharmaceutical

CNC QC Laboratory

Read Case Study
Grade D Packaging
Pharmaceutical

Grade D packaging

Read Case Study
Grade C / ISO7
Pharmaceutical

Grade C Cleanroom Relocation

Read Case Study
Grade C / ISO7
Pharmaceutical

Grade C Pharmaceutical Cleanroom

Read Case Study
Grade C&D CleanCube GMP
R&D

Grade C&D CleanCube GMP

Read Case Study
ISO4, 6 & 7 Nanofabrication Facility
R&D

ISO4, 6 & 7 Nanofabrication Facility

Read Case Study
ISO5 Graphene Research Facility
R&D

ISO5 Graphene Research Facility

Read Case Study
ISO5 Graphene Research Centre
R&D

ISO5 Graphene Research Centre

Read Case Study
Microwave Processing Research Centre
R&D

ISO7 Microwave Processing Research

Read Case Study
Class 1,000/ISO6
R&D

ISO6 Cleanroom Relocation

Read Case Study
Class 10,000 / ISO7
Optical R&D

ISO7 Optoelectronics

Read Case Study