ISO7 Microwave Processing Research

R&D

Cleanroom Solutions

90m2

THE CLIENT

University of Nottingham School of Physics & Astronomy – research spanning Astronomy, Cold Atoms & Quantum Optics, Condensed Matter Theory, Experimental Condensed Matter & Nanoscience, Magnetic Resonance Imaging & Spectroscopy and Particle Cosmology.

The team rose to the challenge and delivered a beautiful controlled environment

Jan Pyrgies, Cleanroom Solutions Director

THE STORY

A new research centre was required for collaboration between the University of Nottingham and e2v technologies in the area of microwave semiconductor device fabrication based at the school of Physics and Astronomy at the university.

An existing laboratory and office space was converted into a suite of cleanrooms. Some existing walls were demolished, new doorways generated and existing exterior windows changed to double glaze aluminium units. The cleanrooms were then fitted out using a laminated partition/wall lining system, lay-in grid suspended ceiling, vinyl flooring with a fully equipped changing room.

The facility was designed as ISO Class 7 turbulent flow with localised ISO Class 5 laminar flow canopies and wet benches. The chemical process benches were for acid and solvent based chemical processing. Emergency shower and eye wash were fitted as safety features for chemical handling.

Services included a number of specialist gases, which were installed using orbital welding. The project included DI water, process chilled water, process extract as well as small power and data fitted in dado trunking.

Air conditioning was mounted externally and consisted of an air handling unit, chiller, chilled water pipework, LPHW pipework from the university’s existing system, humidifiers and controls to achieve the designed close control criteria.

THE RESULT

Cleanroom Solutions Director Jan Pyrgies said: “This project required us to take a laboratory and office and repurpose them as cleanrooms. This required some creative thinking and some skilled work onsite, but the team rose to the challenge and delivered a beautiful controlled environment.”

Case Studies Explore Other Projects

Grade C&D CleanCube GMP
R&D

Grade C&D CleanCube GMP

Read Case Study
ISO6 Packaging Hybrid Isopod
Injection Moulding

ISO6 Packaging Hybrid Isopod

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
ISO8 Medical Device
Medical Device

ISO8 Medical Device

Read Case Study
Grade D Medicine Manufacturing Modular
Pharmaceutical

Grade D Medicine Manufacturing

Read Case Study
ISO5 Graphene Research Facility
R&D

ISO5 Graphene Research Facility

Read Case Study
ISO8 CleanCube Lorry Conversion
Diagnostics

CleanCube Lorry Conversion

Read Case Study
Medical Device Softwall ISOPOD
Medical Device

Medical Device Softwall ISOPOD

Read Case Study
Diagnostics Reagent Manufacturing
Diagnostics

Diagnostics Reagent Manufacturing

Read Case Study
ISO7 Optical Manufacturing Facility
Optical

ISO7 Optical Manufacturing Facility

Read Case Study
ISO7 Packaging Modular
Aerospace

ISO7 Packaging Modular

Read Case Study
ISO7 Manufacturing
Aerospace

ISO7 Manufacturing Modular

Read Case Study
ISO8 Aerospace
Aerospace

ISO8 Aerospace Composites

Read Case Study
Class 10,000/ISO7
Aerospace

ISO7 Aerospace Consultancy

Read Case Study
Class 10,000/ISO6
Aerospace

ISO6 Aerospace Parts

Read Case Study
Class 10,000/ISO7
Automotive

ISO7 Automotive Parts

Read Case Study
Class 100,000/ISO8
Automotive

ISO8 Automotive Parts

Read Case Study
ISO8 CleanCube Lorry Conversion
Diagnostics

CleanCube Lorry Conversion

Read Case Study
CleanCube Mobi Vans
Diagnostics

CleanCube Mobi Vans

Read Case Study
Diagnostics Reagent Manufacturing
Diagnostics

Diagnostics Reagent Manufacturing

Read Case Study
CleanCube mobile solutions
Diagnostics

CleanCube mobile solutions

Read Case Study
Class 1,000/ISO6
Digital Printing

ISO6 Printed Electronics

Read Case Study
Class 100,000/ISO8
Digital Printing

ISO8 Inkjet Printing

Read Case Study
ISO6 Packaging Hybrid Isopod
Injection Moulding

ISO6 Packaging Hybrid Isopod

Read Case Study
Class 1,000/ISO6
Injection Moulding

ISO6 Plastic Packaging

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
ISO8 Medical Device
Medical Device

ISO8 Medical Device

Read Case Study
Sterile Container Manufacturing Facility
Medical Device

ISO7 Sterile Container Facility

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
Medical Device Softwall ISOPOD
Medical Device

Medical Device Softwall ISOPOD

Read Case Study
Class 100,000/ISO8
Medical Device

ISO8 Medical Device

Read Case Study
Class ISO7/Grade C
Medical Device

ISO7 Medical Device Assembly

Read Case Study
Class 100,000/ISO8
Medical Device

ISO8 Advanced Wound Dressing

Read Case Study
ISO7 LCD Technology Research Facility
Micro Electronics

ISO7 LCD Technology Research Facility

Read Case Study
Semiconductor facility
Micro Electronics

ISO7 Microelectronics Suite

Read Case Study
Semiconductor facility
Micro Electronics

ISO5 Semiconductor Facility

Read Case Study
ISO 6 Semiconductor Facility
Micro Electronics

ISO6 Semiconductor Facility

Read Case Study
Class 10/ISO4
Micro Electronics

ISO4 Semi-Conductor Cleanroom

Read Case Study
ISO7 Microscopy Cleanroom
Optical

ISO7 Microscopy Cleanroom

Read Case Study
ISO7 Optical Manufacturing Facility
Optical

ISO7 Optical Manufacturing Facility

Read Case Study
Class 10,000 / ISO7
Optical R&D

ISO7 Optoelectronics

Read Case Study
Grade D Medicine Manufacturing Modular
Pharmaceutical

Grade D Medicine Manufacturing

Read Case Study
Pharmaceutical Development Suite
Pharmaceutical

Class C Pharmaceutical Suite

Read Case Study
Cleanroom Consumables Manufacturing Site
Pharmaceutical

ISO7 Cleanroom Consumables Facility

Read Case Study
CleanCube Grade D Modular Building
Pharmaceutical

CleanCube Grade D Modular Building

Read Case Study
CNC: Pharma QC Lab
Pharmaceutical

CNC QC Laboratory

Read Case Study
Grade D Packaging
Pharmaceutical

Grade D packaging

Read Case Study
Grade C / ISO7
Pharmaceutical

Grade C Cleanroom Relocation

Read Case Study
Grade C / ISO7
Pharmaceutical

Grade C Pharmaceutical Cleanroom

Read Case Study
Grade C&D CleanCube GMP
R&D

Grade C&D CleanCube GMP

Read Case Study
ISO4, 6 & 7 Nanofabrication Facility
R&D

ISO4, 6 & 7 Nanofabrication Facility

Read Case Study
ISO5 Graphene Research Facility
R&D

ISO5 Graphene Research Facility

Read Case Study
ISO5 Graphene Research Centre
R&D

ISO5 Graphene Research Centre

Read Case Study
Microwave Processing Research Centre
R&D

ISO7 Microwave Processing Research

Read Case Study
Class 1,000/ISO6
R&D

ISO6 Cleanroom Relocation

Read Case Study
Class 10,000 / ISO7
Optical R&D

ISO7 Optoelectronics

Read Case Study