ISO7 Medical Device

Medical Device

Temperature: 19+/-2C / Humidity: 30-60% RH

200m2

THE CLIENT

Advanced Medical Solutions Group (AMS) – specialising in the design, development, manufacture and distribution of novel, high-performance tissue-healing technologies, including advanced wound care products, surgical dressings and medical grade materials as well as medical adhesives and sutures for closing and sealing tissue.

THE BRIEF

The client was in the process of extending their existing premises to expand their capability for manufacturing an innovative new Medical Device product. Cleanroom Solutions were engaged as a sub-contractor on behalf of AMS to initially deliver ISO6 and 7 cleanrooms, as well as Personnel and Materials Airlocks.

“I have found Cleanroom Solutions to be a most knowledgeable and professional organisation”

Peter Davies, Group Engineering Manager at Advanced Medical Solutions

THE TECH SPECS

A Controlled Environment designed, installed, cleaned and commissioned by Guardtech built to the following specification:

Structural: GT Shell Pro wall panels, 3 x GT Access Plus single doors (interlocked), GT Rise Max rapid roll doors (interlocked), GT Lid Plus aluminium grid ceiling system, GT Deck ESD vinyl flooring – capped & coved, steelwork C-channels creating a plenum using brackets and panels, GT Vision Plus glazing panels.

Utilities: Compressed air pipework system finished in isolation valves, plumbing with mains hot & cold water to twin wash trough.

Electrical: GT Lux Plus LED light panels, 13amp sockets and CAT6a network data points in three compartment dado trunking, 16amp 3-phase power, Uninterrupted Power Supply (UPS) back-up, electromagnetic doors interlocks.

Mechanical: GT Airt Pro upflow unit, GT Flow Plus H14 HEPA Fan Filter Units with speed control, CAREL mimic screens providing room conditions and air conditioning status, beacon indicators, fully compliant fire alarm system with aspirator pipework and additional smoke detectors and sounders, return air duct probes.

Environmental Monitoring: GT Scan Lite Magnehelic gauges to monitor pressure

Furniture & Equipment: Stainless steel stepover benches, stainless steel garment holder, stainless steel shelving, stainless steel lockers, stainless steel twin wash trough with Dyson Airblade taps.

THE CHALLENGES

Generally, this project went extremely smoothly, with all interested parties working together diligently, efficiently and effectively to produce an excellent build on time and on budget. The only particularly tricky challenge to overcome involved issues with having two big teams on the same site conducting separate works.

Dual works: Ground conditions were not ideal for cleanroom construction when we arrived on site – with the Principal Contractor excavating the ground outside. Due to the external excavation works that were in progress the ground conditions were uneven and presented a daily challenge in getting materials in and out.

As a CDM site, it was critical that the co-ordination communication between the Principal Contractor and Cleanroom Solutions was on point, with a particular focus on the movement of materials in a safe and practical manner. The teams all worked together seamlessly to achieve this, ensuring neither build was compromised in any way.

ISO6 room: Originally, one room was to be ISO6 so naturally had additional FFUs to provide the air change rate. Part way through, AMS decided that the ISO6 room could be downgraded to ISO7. We made no changes to the FFU design and left the room as per the original design, thus presenting the IQ & OQ as ISO7. This room will naturally achieve ISO6 conditions due to the amount of FFUs but would need to be revalidated accordingly.

THE RESULT

Peter Davies, Group Engineering Manager at Advanced Medical Solutions, said: “From worksite safety, timekeeping and productivity to communication and value for money, Cleanroom Solutions have been excellent across the board. I have found Cleanroom Solutions to be a most knowledgeable and professional organisation who worked with us on the design requirements and then delivered precisely what we expected.”

Case Studies Explore Other Projects

Grade C&D CleanCube GMP
R&D

Grade C&D CleanCube GMP

Read Case Study
ISO6 Packaging Hybrid Isopod
Injection Moulding

ISO6 Packaging Hybrid Isopod

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
ISO8 Medical Device
Medical Device

ISO8 Medical Device

Read Case Study
Grade D Medicine Manufacturing Modular
Pharmaceutical

Grade D Medicine Manufacturing

Read Case Study
ISO5 Graphene Research Facility
R&D

ISO5 Graphene Research Facility

Read Case Study
ISO8 CleanCube Lorry Conversion
Diagnostics

CleanCube Lorry Conversion

Read Case Study
Medical Device Softwall ISOPOD
Medical Device

Medical Device Softwall ISOPOD

Read Case Study
Diagnostics Reagent Manufacturing
Diagnostics

Diagnostics Reagent Manufacturing

Read Case Study
ISO7 Optical Manufacturing Facility
Optical

ISO7 Optical Manufacturing Facility

Read Case Study
ISO7 Packaging Modular
Aerospace

ISO7 Packaging Modular

Read Case Study
ISO7 Manufacturing
Aerospace

ISO7 Manufacturing Modular

Read Case Study
ISO8 Aerospace
Aerospace

ISO8 Aerospace Composites

Read Case Study
Class 10,000/ISO7
Aerospace

ISO7 Aerospace Consultancy

Read Case Study
Class 10,000/ISO6
Aerospace

ISO6 Aerospace Parts

Read Case Study
Class 10,000/ISO7
Automotive

ISO7 Automotive Parts

Read Case Study
Class 100,000/ISO8
Automotive

ISO8 Automotive Parts

Read Case Study
ISO8 CleanCube Lorry Conversion
Diagnostics

CleanCube Lorry Conversion

Read Case Study
CleanCube Mobi Vans
Diagnostics

CleanCube Mobi Vans

Read Case Study
Diagnostics Reagent Manufacturing
Diagnostics

Diagnostics Reagent Manufacturing

Read Case Study
CleanCube mobile solutions
Diagnostics

CleanCube mobile solutions

Read Case Study
Class 1,000/ISO6
Digital Printing

ISO6 Printed Electronics

Read Case Study
Class 100,000/ISO8
Digital Printing

ISO8 Inkjet Printing

Read Case Study
ISO6 Packaging Hybrid Isopod
Injection Moulding

ISO6 Packaging Hybrid Isopod

Read Case Study
Class 1,000/ISO6
Injection Moulding

ISO6 Plastic Packaging

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
ISO8 Medical Device
Medical Device

ISO8 Medical Device

Read Case Study
Sterile Container Manufacturing Facility
Medical Device

ISO7 Sterile Container Facility

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
Medical Device Softwall ISOPOD
Medical Device

Medical Device Softwall ISOPOD

Read Case Study
Class 100,000/ISO8
Medical Device

ISO8 Medical Device

Read Case Study
Class ISO7/Grade C
Medical Device

ISO7 Medical Device Assembly

Read Case Study
Class 100,000/ISO8
Medical Device

ISO8 Advanced Wound Dressing

Read Case Study
ISO7 LCD Technology Research Facility
Micro Electronics

ISO7 LCD Technology Research Facility

Read Case Study
Semiconductor facility
Micro Electronics

ISO7 Microelectronics Suite

Read Case Study
Semiconductor facility
Micro Electronics

ISO5 Semiconductor Facility

Read Case Study
ISO 6 Semiconductor Facility
Micro Electronics

ISO6 Semiconductor Facility

Read Case Study
Class 10/ISO4
Micro Electronics

ISO4 Semi-Conductor Cleanroom

Read Case Study
ISO7 Microscopy Cleanroom
Optical

ISO7 Microscopy Cleanroom

Read Case Study
ISO7 Optical Manufacturing Facility
Optical

ISO7 Optical Manufacturing Facility

Read Case Study
Class 10,000 / ISO7
Optical R&D

ISO7 Optoelectronics

Read Case Study
Grade D Medicine Manufacturing Modular
Pharmaceutical

Grade D Medicine Manufacturing

Read Case Study
Pharmaceutical Development Suite
Pharmaceutical

Class C Pharmaceutical Suite

Read Case Study
Cleanroom Consumables Manufacturing Site
Pharmaceutical

ISO7 Cleanroom Consumables Facility

Read Case Study
CleanCube Grade D Modular Building
Pharmaceutical

CleanCube Grade D Modular Building

Read Case Study
CNC: Pharma QC Lab
Pharmaceutical

CNC QC Laboratory

Read Case Study
Grade D Packaging
Pharmaceutical

Grade D packaging

Read Case Study
Grade C / ISO7
Pharmaceutical

Grade C Cleanroom Relocation

Read Case Study
Grade C / ISO7
Pharmaceutical

Grade C Pharmaceutical Cleanroom

Read Case Study
Grade C&D CleanCube GMP
R&D

Grade C&D CleanCube GMP

Read Case Study
ISO4, 6 & 7 Nanofabrication Facility
R&D

ISO4, 6 & 7 Nanofabrication Facility

Read Case Study
ISO5 Graphene Research Facility
R&D

ISO5 Graphene Research Facility

Read Case Study
ISO5 Graphene Research Centre
R&D

ISO5 Graphene Research Centre

Read Case Study
Microwave Processing Research Centre
R&D

ISO7 Microwave Processing Research

Read Case Study
Class 1,000/ISO6
R&D

ISO6 Cleanroom Relocation

Read Case Study
Class 10,000 / ISO7
Optical R&D

ISO7 Optoelectronics

Read Case Study