Grade C&D CleanCube GMP

Cell & Gene Therapy

20+/-2C --- 50+/-10% RH

30m2

THE CLIENT

Oxford University Hospitals NHS Foundation Trust – an English teaching hospital and part of the Shelford Group, a collaboration of ten of the largest teaching and research NHS hospital trusts in England. OUH is one of the UK’s largest teaching hospitals and one of the largest hospitals in Europe. The trust is made up of four hospitals – the John Radcliffe Hospital (which includes the Children’s Hospital, West Wing, Eye Hospital, Heart Centre and Women’s Centre), the Churchill Hospital and the Nuffield Orthopaedic Centre, all located in Oxford, and the Horton General Hospital in Banbury, north Oxfordshire.

THE BRIEF

Oxford University Hospitals’ Pharmacy Department required a temporary cleanroom facility to facilitate the aseptic production of medicinal products – including Advanced Therapy Medicinal Products (ATMPs) for clinical trials – whilst they construct a new fully scoped-out manufacturing facility in their main building.

THE TECH SPECS

A Controlled Environment designed, installed, cleaned and commissioned by Guardtech built to the following specification:

Structural: GT Shell Pro wall panels, GT Lid Pro panelled ceiling, GT Access Plus semi flush single doors, GT Deck Plus flooring capped & coved, emergency break out perspex panel in stainless frame with rubber gasket seal.

Electrical: GT Lux Lite lighting providing 750 lux at bench level, 13-amp sockets flush mounted in classified areas, double CAT6a data sockets, uninterrupted power supply (UPS) with touchscreen interface, electromagnetic door interlocks.

Mechanical: GT Air Slim H14 HEPA slimline Fan Filter Units with G4 Pre-Filters, 3.6kW and 7.1kW air condition fan coil units suspended within the ceiling void above the panelled ceiling, providing temperature control within three separated plenums matched to three external condensers.

Monitoring: GT Scan Pro environmental monitoring system (EMS) featuring in-room stainless steel LCD transmitters displaying temperature, humidity & pressure, with information fed back to desktop PC control system.

Furniture & Equipment: Trespa TopLab workbenches with stainless steel frames, Trespa stepover bench with compartments, stainless steel mobile sink, Trespa under bench cabinets, stainless steel transfer hatches with mechanical interlocks and thermoplastic door vision panels, stainless steel wire racking, stainless steel 3-compartment dispenser, stainless steel coat hooks, full-length stainless steel mirror.

THE CHALLENGES

Individualised temperature zones: This was essentially a CleanCube GMP at heart, but there were still a number of major modifications to challenge both Guardtech’s Design and Installation teams. The design had to accommodate a significant amount of utilities in a minimised footprint – with an individualised temperature zone for each room in the container. Guardtech needed to accommodate three separate fan coil units across the entire unit within a very restricted 500mm ceiling void/plenum.

Battery back-up: It was essential that this unit had a critical emergency power supply support solution in place, and so the CleanCube team created a dedicated plant cupboard to house an Uninterrupted Power Supply (UPS) to give complete battery back-up for the CleanCube.

Isolating the issue: The client needed the 40ft unit to not only include both primary and secondary change areas, but we also had to design the CleanCube to house a very large isolator. This was not something we’d tackled before in a CleanCube, but it was a challenge we were more than ready for – and duly surmounted.

THE RESULT

Guardtech Group Commercial Director Mark Wheeler said: “It was great to produce such an interesting CleanCube GMP with some really challenging modifications. The lessons we learnt in designing and building this model will serve us well in the future as we continue to provide more and more exciting, bespoke units for clients doing revolutionary work in the fields of Science, Engineering and beyond.”

Case Studies Explore Other Projects

ISO8 Precision Systems Modular
Aerospace

ISO8 Precision Systems Modular

Read Case Study
ISO7 Electronics Softwall Isopods
Micro Electronics

ISO7 Electronics Softwall Isopods

Read Case Study
ISO8 Medical Device
Medical Device

ISO8 Medical Device

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
Grade C&D CleanCube GMP
R&D

Grade C&D CleanCube GMP

Read Case Study
ISO6 Packaging Hybrid Isopod
Injection Moulding

ISO6 Packaging Hybrid Isopod

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
ISO8 Medical Device
Medical Device

ISO8 Medical Device

Read Case Study
Grade D Medicine Manufacturing Modular
Pharmaceutical

Grade D Medicine Manufacturing

Read Case Study
ISO5 Graphene Research Facility
R&D

ISO5 Graphene Research Facility

Read Case Study
ISO8 Precision Systems Modular
Aerospace

ISO8 Precision Systems Modular

Read Case Study
ISO7 Packaging Modular
Aerospace

ISO7 Packaging Modular

Read Case Study
ISO7 Manufacturing
Aerospace

ISO7 Manufacturing Modular

Read Case Study
ISO8 Aerospace
Aerospace

ISO8 Aerospace Composites

Read Case Study
Class 10,000/ISO7
Aerospace

ISO7 Aerospace Consultancy

Read Case Study
Class 10,000/ISO6
Aerospace

ISO6 Aerospace Parts

Read Case Study
Class 10,000/ISO7
Automotive

ISO7 Automotive Parts

Read Case Study
Class 100,000/ISO8
Automotive

ISO8 Automotive Parts

Read Case Study
ISO8 CleanCube Lorry Conversion
Diagnostics

CleanCube Lorry Conversion

Read Case Study
CleanCube Mobi Vans
Diagnostics

CleanCube Mobi Vans

Read Case Study
Diagnostics Reagent Manufacturing
Diagnostics

Diagnostics Reagent Manufacturing

Read Case Study
CleanCube mobile solutions
Diagnostics

CleanCube mobile solutions

Read Case Study
Class 1,000/ISO6
Digital Printing

ISO6 Printed Electronics

Read Case Study
Class 100,000/ISO8
Digital Printing

ISO8 Inkjet Printing

Read Case Study
ISO7 Injection Moulding Softwall Isopod
Injection Moulding

ISO7 Injection Moulding Softwall Isopod

Read Case Study
ISO6 Packaging Hybrid Isopod
Injection Moulding

ISO6 Packaging Hybrid Isopod

Read Case Study
Class 1,000/ISO6
Injection Moulding

ISO6 Plastic Packaging

Read Case Study
ISO8 Medical Device
Medical Device

ISO8 Medical Device

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
ISO8 Medical Device
Medical Device

ISO8 Medical Device

Read Case Study
Sterile Container Manufacturing Facility
Medical Device

ISO7 Sterile Container Facility

Read Case Study
ISO7 Medical Device
Medical Device

ISO7 Medical Device

Read Case Study
Medical Device Softwall ISOPOD
Medical Device

Medical Device Softwall ISOPOD

Read Case Study
Class 100,000/ISO8
Medical Device

ISO8 Medical Device

Read Case Study
Class ISO7/Grade C
Medical Device

ISO7 Medical Device Assembly

Read Case Study
ISO7 Electronics Softwall Isopods
Micro Electronics

ISO7 Electronics Softwall Isopods

Read Case Study
ISO7 LCD Technology Research Facility
Micro Electronics

ISO7 LCD Technology Research Facility

Read Case Study
Semiconductor facility
Micro Electronics

ISO7 Microelectronics Suite

Read Case Study
Semiconductor facility
Micro Electronics

ISO5 Semiconductor Facility

Read Case Study
ISO 6 Semiconductor Facility
Micro Electronics

ISO6 Semiconductor Facility

Read Case Study
Class 10/ISO4
Micro Electronics

ISO4 Semi-Conductor Cleanroom

Read Case Study
ISO7 Microscopy Cleanroom
Optical

ISO7 Microscopy Cleanroom

Read Case Study
ISO7 Optical Manufacturing Facility
Optical

ISO7 Optical Manufacturing Facility

Read Case Study
Class 10,000 / ISO7
Optical R&D

ISO7 Optoelectronics

Read Case Study
Grade D Medicine Manufacturing Modular
Pharmaceutical

Grade D Medicine Manufacturing

Read Case Study
Pharmaceutical Development Suite
Pharmaceutical

Class C Pharmaceutical Suite

Read Case Study
Cleanroom Consumables Manufacturing Site
Pharmaceutical

ISO7 Cleanroom Consumables Facility

Read Case Study
CleanCube Grade D Modular Building
Pharmaceutical

CleanCube Grade D Modular Building

Read Case Study
CNC: Pharma QC Lab
Pharmaceutical

CNC QC Laboratory

Read Case Study
Grade D Packaging
Pharmaceutical

Grade D packaging

Read Case Study
Grade C / ISO7
Pharmaceutical

Grade C Cleanroom Relocation

Read Case Study
Grade C / ISO7
Pharmaceutical

Grade C Pharmaceutical Cleanroom

Read Case Study
Grade C&D CleanCube GMP
R&D

Grade C&D CleanCube GMP

Read Case Study
ISO4, 6 & 7 Nanofabrication Facility
R&D

ISO4, 6 & 7 Nanofabrication Facility

Read Case Study
ISO5 Graphene Research Facility
R&D

ISO5 Graphene Research Facility

Read Case Study
ISO5 Graphene Research Centre
R&D

ISO5 Graphene Research Centre

Read Case Study
Microwave Processing Research Centre
R&D

ISO7 Microwave Processing Research

Read Case Study
Class 1,000/ISO6
R&D

ISO6 Cleanroom Relocation

Read Case Study
Class 10,000 / ISO7
Optical R&D

ISO7 Optoelectronics

Read Case Study